Major Maintenance FY 2019
Project Manager: Roseann Sillasen
placed on waste reduction, recycling, environmentally preferable purchasing, energy conservation and
the use of materials that are either harvested through sustainable methods or made from
recyclable materials.
(interactive)
(static)
___________________________________________________________________________________________________________________
Historical Information for work performed and completed Summer/Fall 2018
- (PDF) (updated as documents become available)
___________________________________________________________________________________________________________________
- Hazardous Material By Location
- Addenda see projects below
Project Specifications for all projects (Addendum #05 dated 3/22/18):
-
___________________________________________________________________________________________________________________
BIDDING IS BY INVITATION. CONTACT Roseann Sillasen WITH YOUR INTEREST TO BID.
THE FOLLOWING IS A LIST OF WORK TO BE COMPLETED SUMMER 2018. AS SCOPES BECOME AVAILABLE, LINKS WILL BE UPLOADED IN THE PROJECT DESCRIPTION BELOW.
Project Description: Renovate kitchen and bathroom. Electrical and interior paint throughout.
Project Schedule: 5/29/18 - 8/1/18
Awarded Contractor: CSS Morello
/ / /
Building Name: Daycare - 20 Lawn Avenue
Building Name: 34 Lawn Ave
Building Name: 11 Vine Street
Building Name: 200 High Street
Project Manager: RZS
Project Description: Replace flooring, acoustic ceilings
Project Schedule: 5/29/18 - 7/31/18
Awarded Contractor: Aresco Construction
/ / / / /
Building Name: 255 Williams Street
Project Manager: RZS
Project Description: Interior renovations to 3- family
Project Schedule: 4/1/18 - 7/6/18
Awarded Contractor: Morrison Developers
/ / / / / / / /
Building Name: 259 Williams Street
Project Manager: RZS/AS/VD
Project Description: Interior renovations to 3- family
Project Schedule: 4/2/18 - 7/13/18
Awarded Contractor: CSS Morello
/ / / / / / / / /
/ /
Building Name: 45 Lawn Avenue
Project Manager: RZS
Project Description: Construction of entire interior of single family
Project Schedule: 4/2/18 - 8/10/18
Awarded Contractor: CSS Morello
3-15-18 / / / / / / / / / /
Building Name: 107 High Street
Project Manager: RZS
Project Description: Convert common room to bedroom. Includes new walls, door, flooring, paint, sprinkler head, lighting.
Project Schedule: 6/1/18 - 7/1/18
Awarded Contractor:
/ // / /
Building Name: Undergrad Woodframes
Project Manager: MR
Project Description: Undergrad Woodframes porch repairs and replacements at the following locations:
, , , , , ,
Project Schedule: 5/29/18 - 8/11/18
Awarded Contractor: CSS Morello
Building Name: Undergrad Woodframes
Project Manager: MR
Project Description: Undergrad Woodframes Interior 1st Floor Framing Repairs and Structural Reinforcement. Areas will not be visited during the prebid. Reference photos for current conditions. ,, ,, , , , , , , , , , , , , ,, , , , , , , , ,,, , , .
Project Schedule: 5/29/18 - 7/27/18
Awarded Contractor: Morrison Developers
/ / , / / / // / /
Building Name: Foss Hill Unit 8 - Foss Hill Drive
Project Manager: RZS
Project Description: Install new VCT floor tile and base in identified bedrooms (44 Rooms). Abatement scheduled 6/4/18-6/29/18. Floor replacement scheduled 7/2/18 - 7/27/18. Power outage begins 7/30/18.
Project Schedule: 6/4/18 - 7/28/18
Awarded Contractor: Olson Flooring
/ / /
Building Name: Foss Hill Unit 9 - Foss Hill Drive
Project Manager: RZS/BH
Project Description: Remove existing carpet and install new flooring.
Project Schedule: 7/30/18 - 8/17/18
Awarded Contractor: All Floors, Inc.
/ / /
Building Name: High Rise - 110 Church Street
Project Manager: MC/RZS
Project Description: Replace passenger elevator controls and interior finishes. Elevators will be out of service for the summer.
Project Schedule: 6/1/18 - 8/10/18
Awarded Contractor: Otis Elevator
Project Manager: RZS
Project Description: Spray apply breathable waterproofing to
Project Schedule: 6/1/18 -7/31/18
Awarded Contractor:
Building Name: HighRise - 110 Church Street
Project Manager: MR/RZS
Project Description: Install new interior double hung storm windows in all bedroom units. Install new window units in area coordinator's apartment on
Project Schedule: 5/29/18 - 8/11/18
Awarded Contractor: SWI
/ / / / / / / /
Building Name: 230 Washington Street
Project Manager: RZS
Project Description: Install new reportable fire alarm system to replace
Project Schedule: 5/29/18 - 8/10/18
Awarded Contractor: Schultz Electric
// / / / / /
Building Name: Park Washington - 256 Washington Street
Project Manager: RZS
Project Description: Exterior Envelope Repairs; replace all masonry joints, lintel repairs above all windows.
Project Schedule: 5/29/18 - 8/11/18
Awarded Contractor:
Scope /
Building Name: CFA Theater- 271 Washington Terrance
Project Manager: MR
Project Description: Address groundwater infiltration
Project Schedule: 7/29/18 - 8/11/18
Awarded Contractor:
Building Name: Judd Hall - Suite 401
Project Manager: RZS
Project Description: Laminate existing walls with gypsum
Awarded Contractor: Raccio Construction
/ / /
Building Name: Davison Health Center - 327 High Street
Project Manager: WN/RZS
Project Description: Replace floors in clinical exam rooms. Coordinate with abatement schedule. Occupied building.
Project Schedule: 5/29/18 - 7/15/18
Awarded Contractor: Olson Flooring
/ / /
Building Name: Hall Atwater - 237 Church St
Project Manager: MC/RZS
Project Description: Replace Air Handler Unit AC-5 which serves Shanklin & Hall - Atwater connector of 3rd floor with
Project Schedule: 3/15/18 - 5/1/18
Awarded Contractor: EEI
Project Manager: MR/RZS
Project Description: Window restoration and interior perimeter window
Project Schedule: 5/29/18 - 10/26/18
Awarded Contractor:
Building Name: Olin Library - 252 Church Street
Project Manager: RZS/BH
Project Description: Replace 1st-floor carpet in common areas identified. Work to be coordinated with window restoration project.
Project Schedule: To be coordinated with window restoration project.
Awarded Contractor:
/ /
Building Name: Admissions - 70 Wyllys Ave
Project Manager: BH/MR
Project Description: Modernize and renovate 1st-floor bathrooms
Project Schedule: Coordinated with Admissions summer schedule.
Awarded Contractor:
Building Name: Exley Science Center - 265 Church Street
Project Manager: RZS/MC
Project Description: Replace both passenger elevator controls and interior finishes. Work will be performed on one elevator at a time. Elevator #1 will be out of service 6/1/18 - 8/3/18; elevator #2 will be out of
Project Schedule: 6/1/18 - 10/8/18
Awarded Contractor: Otis Elevator
Building Name: Campuswide
Project Manager: RB
Project Description: Tree planting in various areas; Foss Hill, Olin, College Row, and CFA
Project Schedule: Coordinated with growing schedule.
Awarded Contractor: Stonehedge
Building Name: Campuswide
Project Manager: RB
Project Description: Irrigation sustainability upgrades:
Project Schedule: Installation to be coordinated with Grounds Manager.
Building Name: High Street Daycare - 115 High Street
Building Name: J Lot - 272 - 278 Court Street Entry Driveway
Project Manager: RB
Project Description: Replace asphalt driveway to 272-278 Court Street with new base and asphalt.
Project Schedule: 5/29/18 - 6/4/18
Awarded Contractor: Raccio Construction
/ / /
Project Manager: MR
Project Description: Jackson Field Drainage Repair: Install new drainage piping, reset catch basins for positive drainage, installation of sod.
Project Schedule: 5/29/18 - 6/30/18
Awarded Contractor: Stonehedge
/ / /
Project Manager: BH/RZS
Project Description: Perform classroom renovations in buildings identified. Scope in progress.
Project Schedule: 5/29/18 - 8/11/18
Building Name: Freeman Athletic Center - 161 Cross Street
Project Manager: RZS
Project Description: Aquatics meeting room- install new epoxy flooring. Install new 2 x 2 drop ceiling system. (Provide
Project Schedule: 8/6/18 - 8/24/18
Awarded Contractor:
Building Name: 156 High Street
Project Manager: RZS
Project Description: Roof Replacement
Project Schedule: 5/29/18 - 7/15/18
Awarded Contractor: Dahill Roofing
/ / / / /
Building Name: Butterfield A - 25 Lawn Avenue
Project Manager: RZS
Project Description: Roof replacement of pods 1, 2, 3 and 6. Coordinate with summer camps.
Project Schedule: 5/29/18 - 8/11/18
Awarded Contractor: Dahill Roofing
/ / / / / / Addendum #5A Attachments 3-22-18
Building Name: Foss Hill Unit 2-3 Connector - Foss Hill Drive
Project Manager: RZS
Project Description: Replace existing quarry tile walkway surface. Install waterproofing system below new tile installation. Cap perimeter bluestone. Work to be coordinated with summer programs. Buildings are occupied by summer sports camps.
Project Schedule: 5/29/18 - 7/15/18
Awarded Contractor: Eagle Rivet
/ / / /
Project Manager: RZS
Project Description: Roof replacement over entry connector. Work to be coordinated with summer programs. Buildings are occupied by summer sports camps.
Project Schedule: 6/4/18 - 7/6/18
Project Manager: RZS
Project Description: Roof Replacement and modifications for
Project Schedule: 5/29/18 - 7/21/18
-
Building Name: Exley Science Center / Hall Atwater Connector - 52 Lawn Avenue
Project Manager: RZS
Project Description: Roof Replacement. Limited access to site.
Project Schedule: 6/4/18 - 7/6/18
Awarded Contractor: Silktown Roofing
/ / / /
Additional work will be listed as it becomes available.
HAZARDOUS MATERIAL REPORTS BY LOCATION:
, , , , , , , , , , , ,
ACAD=Academic Admin=Administrative Infra=Infrastructure RP=Rental Properties SLF=Student Life Facilities SLF-WF=Student Life Facilities-Woodframes ATH=Athletics
CPP=Central Power Plant AAF=Academic & Administrative Affairs MH=Manhole DDC=Direct Digital Controls GFI=Ground Fault Interrupt SW=southwest ADA=Americans with Disabilities Act
CFA=Center for the Arts